| Sign In | Join Free | My infospaceinc.com |
|
Supply Ability : 100000
Length Range : 1.6-6.0 m
Brand Name : xsh
Load Capacity : 250 kg(551.16lb)
Certification : CE, ISO 9001
Pedal Length : 1880 mm
Price : $10
Inner Tube : 40-60 mm
MOQ : 300
Head Type : U Head Support
Payment Terms : T/T
Outer Tube : 48-76 mm
Place of Origin : china
Adjustment Method : Threaded Shaft With Wing Collar
Delivery Time : 15
Thickness : 1.5-4.0 mm
The Adjustable Scaffolding Steel Prop is a high-strength vertical support system designed for construction shoring. Also known as acrow props, these components support formwork for concrete slabs, beams, and columns. With flexible length adjustment, they ensure precise height control and structural stability on-site.
Our steel props feature a modular design with an inner tube, outer tube, prop nut, and G-pin. They are characterized by high load-bearing capacity and easy handling. The telescopic adjustment fits various floor heights, making it a versatile tool for any project.
We utilize induction welding for seamless joints. Surface treatments include hot-dip galvanization or powder coating, providing excellent resistance to corrosion and mechanical wear, extending service life in harsh environments.
The operation relies on screw-thread adjustment. By rotating the prop nut along the threaded sleeve, the inner tube extends to the required height. The G-pin locks the system, transferring the vertical load to the base plate.
| Prop Type | Inner Tube (mm) | Outer Tube (mm) | Length Range (m) | Thickness (mm) |
|---|---|---|---|---|
| Spanish Type | 40 | 48 | 1.6-2.9 / 2.0-3.6 | 1.5-2.0 |
| Italian Type | 48 | 56 | 2.0-3.6 / 2.2-4.0 | 1.6-2.5 |
| Middle East | 48 | 60 | 2.0-3.5 / 2.5-4.5 | 1.8-3.0 |
| Heavy Duty | 60 | 76 | 3.0-5.0 / 3.5-6.0 | 2.5-4.0 |
We provide technical support, site consultation, and custom design. Our logistics team ensures timely global shipping with 24/7 customer responsiveness.
Our process involves precision pipe cutting, robotic welding, and finish treatment before being bundled for shipment.
Place the base plate, extend the inner tube, insert the G-pin, and rotate the nut to secure against formwork.
Never exceed rated load capacity. Ensure props are vertical. Regularly inspect threads and pins for wear.
With decades of scaffolding expertise, we are a trusted partner for global contractors. Our automated production ensures precision and safety for every project.
|
|
High Load Capacity Adjustable Scaffolding Steel Prop with Threaded Shaft Adjustment and Hot-Dip Galvanized Construction Shoring Support Images |